We provide service and maintenance after construction as needed, weekly maintenance is available when the pool is located within our service area.

Payments are required in accordance to the project progress. Each completed phase is billed and due upon completion.

Yes. We can provide a detailed 3D drawing upon approval of the CAD design/drawing. 3D drawings are billed at $100 per hour with a $1,000 minimum.

Each project is unique. We offer incentives on each proposal based on the scope of the project.

There’s no need to base your design on an average, but 30 feet by 15 feet is common

This all depends upon the city you live in and the design and amenities of your pool. Barring any interruption from Mother Nature, the average is 6 to 8 weeks in length.

Depending on your jurisdiction, it may take 5 days or 4 weeks. In general, expect it to take 2 to 3 weeks.

Provided there is enough available space for the body of water and associated equipment, a spa can be added to an existing pool.